As the impending threat of Cyclone Dana loomed large over the region, we The Rajwada Group, demonstrated our commitment to the safety and well-being of its residents and ongoing projects. With a comprehensive care and protection plan in place, we took proactive measures to safeguard its properties and ensure the security of its occupants.
A Proactive Approach to Safety
Rajwada Group’s cyclone preparedness plan encompassed a wide range of preventive measures, including:
- Structural Assessments: Thorough inspections were conducted on all existing residences and ongoing construction sites to assess their vulnerability to high winds and heavy rainfall. Necessary reinforcements and modifications were implemented to enhance structural integrity.
- Emergency Response Teams: Dedicated emergency response teams were mobilized to provide immediate assistance in case of any unforeseen circumstances. These teams were equipped with essential supplies and trained to handle emergency situations effectively.
- Communication Channels: Robust communication channels were established to keep residents informed about the cyclone’s progress and provide timely updates on safety precautions. Regular updates were disseminated through various platforms, including SMS alerts, social media, and community newsletters.
- Community Outreach Initiatives: Rajwada Group actively engaged with local communities to promote awareness about cyclone preparedness. Volunteers distributed essential supplies, such as food, water, and first-aid kits, to vulnerable populations.
For Rajwada Group’s ongoing construction projects, additional safety measures were implemented to minimize damage and ensure project continuity. These measures included:
- Site Security: Construction sites were secured with temporary barricades and protective coverings to shield equipment and materials from the elements.
- Equipment Removal: Non-essential equipment was relocated to safe storage areas to prevent damage.
- Drainage Systems: Drainage systems were inspected and cleared to facilitate water flow and prevent flooding.
- Emergency Power Backup: Backup generators were installed to ensure uninterrupted power supply for essential operations.
A Testament to Commitment
Rajwada Group’s comprehensive care and protection plan for Cyclone Dana demonstrated its unwavering commitment to its residents’ and stakeholders’ safety and well-being. By taking proactive measures and prioritizing community safety, the group has solidified its reputation as a responsible and reliable real estate developer.
Track here the live update of cyclone Dana: https://zoom.earth/storms/dana-2024